Yardage concrete calculator

A rectangular pour, measured as an area and a depth.

Any pour, straight to the cubic yards a plant quotes in.

ft
ft
$/yd³

Decimals fine. Bag counts round up.

At 20 × 20 ft and 4 inches you need

4.94 cubic yards

133.3 cubic feet · 18,670 lb of concrete · order 5.43 yd³ with the 10% waste allowance

223bags of 80 lb245 with 10% waste
297bags of 60 lb326 with 10% waste
1mixer-truck load
$830–$1,120ready-mix at $180/yd³

Order ready-mix. At 4.94 yd³ you are 3.7 times past the point where bagging pays. That is one truck, one morning — against 223 bags to lift, mix and place before the first batch sets.

Two rules, each where it applies. Bag counts carry no waste allowance — a partial bag is not a thing you can buy, and an unopened one goes back — so the headline count is the volume and the figure beside it is the same count with waste. The ready-mix figure carries its allowance inside because a truck will not come back for a quarter yard.

Section through the slab. Thickness is measured from the top of the compacted gravel base, not from the ground. 4 inmeasure from herenot from here

The inch that costs $240

Thickness runs from the top of the compacted gravel to the finished surface. Measure from the dirt and you count the base as concrete: on this pour, one inch of that error is 1.23 extra cubic yards — about $240 of ready-mix, or 56 bags nobody needed. Set a stake to the finished height before you order.

The arithmetic, in the open

How this page gets its numbers

Volume, cubic feet
20 × 20 × (4 ÷ 12) = 133.3 ft³
Cubic yards
133.3 ft³ ÷ 27 = 4.94 yd³
80 lb bags
ceiling(133.3 ÷ 0.60 ft³ a bag) = 223 bags, no waste allowance; with 10% waste, 245
60 lb bags
ceiling(133.3 ÷ 0.45 ft³ a bag) = 297 bags, no waste allowance; with 10% waste, 326
Weight
133.3 ft³ × 140 lb per ft³ = 18,670 lb
Order allowance
4.94 yd³ plus 10% = 5.43 yd³ ordered
Truck loads
ceiling(5.43 yd³ ordered ÷ 10 yd³ a load) = 1 — a full truckload is typically about 10 cubic yards

Bag counts round up. A partial bag is not a thing you can buy, so a calculated 222.2 bags is 223 bags.

Yardage presets

The 6 sets people ask for most

At 4 in thick; the arrow figure is the same bag count with 10% waste.
SlabArea ft²Cubic yards80 lb bags→ with 10% wasteBuy as
20 × 30 ft 600 7.41 334→367 Ready-mix
24 × 24 ft 576 7.11 320→352 Ready-mix
30 × 30 ft 900 11.11 500→550 Ready-mix
30 × 40 ft 1,200 14.81 667→734 Ready-mix
40 × 40 ft 1,600 19.75 889→978 Ready-mix
40 × 60 ft 2,400 29.63 1,334→1,467 Ready-mix

A different shape

The other 7 calculators

Asked about this shape

Questions

How much concrete does 20 × 20 ft and 4 inches take?

4.94 cubic yards, which is 133.3 cubic feet before any allowance. Order 5.43 yd³ to carry the 10% waste.

What does that much concrete cost?

About $830 to $1,120 for the mix delivered, at $180 per cubic yard on 5.43 ordered yards. Replace the price with your own quote — it is the one number on this page that moves with where you live.

Why do plants quote in cubic yards?

Because a drum is loaded by volume and a yard is the unit the industry settled on. One cubic yard is 27 cubic feet, so a figure in feet divides by 27 to become the number you say on the phone.

How many 80 lb bags are in a cubic yard?

45, and you buy 45. An 80 lb bag of mix yields about 0.60 cubic feet once water is in it, and a cubic yard is 27 cubic feet. A 60 lb bag yields about 0.45 cubic feet, so 60 of those make a yard. Every bag count on this site is rounded up, because a store will not sell you nine tenths of a bag.

How much extra should I order?

10 percent, and where it appears depends on what you are buying. Ready-mix carries it inside the ordered figure, because a truck will not come back for a quarter yard. Bag counts do not: the headline count is the volume, and the plus figure sits beside it, because bags are bought one at a time and an unopened one goes back. Either way the allowance covers spillage, a base that is not perfectly flat and the thickness you gain at the edges of the form.

What is a mixer-truck load?

A full truckload is typically about 10 cubic yards, and that is the figure this site plans with. Ask when you book: drums vary, and a plant will tell you what it is sending. The load count here is worked from the ordered volume — the one that already includes the 10% allowance — because that is what actually has to fit on the truck.

Does this include rebar, forms or labour?

No. The price band is concrete delivered: your own price per yard on the ordered volume, taken 15% either side of the middle to cover what a quote actually varies by. Forms, gravel, mesh or bar, a pump if the truck cannot reach, and finishing are all separate. Get the plant to quote your postcode before you budget.