Skip to the calculator
concreteslabcalc

Concrete slab calculator

Measurements in, a quantity you can order out.

ft
ft
$/yd³

Decimals fine. Bag counts round up.

You need

4.94 cubic yards

133.3 cubic feet · 18,670 lb of concrete · order 5.43 yd³ with the 10% waste allowance

223bags of 80 lb245 with 10% waste
297bags of 60 lb326 with 10% waste
1mixer-truck load
$830–$1,120ready-mix at $180/yd³

Order ready-mix. At 4.94 yd³ you are 3.7 times past the point where bagging pays. That is one truck, one morning — against 223 bags to lift, mix and place before the first batch sets.

Two rules, each where it applies. Bag counts carry no waste allowance — a partial bag is not a thing you can buy, and an unopened one goes back — so the headline count is the volume and the figure beside it is the same count with waste. The ready-mix figure carries its allowance inside because a truck will not come back for a quarter yard.

Section through the slab. Thickness is measured from the top of the compacted gravel base, not from the ground. 4 inmeasure from herenot from here

The inch that costs $240

Thickness runs from the top of the compacted gravel to the finished surface. Measure from the dirt and you count the base as concrete: on this pour, one inch of that error is 1.23 extra cubic yards — about $240 of ready-mix, or 56 bags nobody needed. Set a stake to the finished height before you order.

Already worked out, no typing

Common slab sizes at 4 inches

Quantities at 4 in thick, bag counts rounded up. The arrow figure is the same count with 10% waste.
SlabCubic yards80 lb bags→ with 10% wasteBuy as
8 × 8 ft 0.79 36→40 Bags
10 × 10 ft 1.23 56→62 Bags
10 × 12 ft 1.48 67→74 Ready-mix
12 × 12 ft 1.78 80→88 Ready-mix
12 × 16 ft 2.37 107→118 Ready-mix
16 × 16 ft 3.16 143→157 Ready-mix
20 × 20 ft 4.94 223→245 Ready-mix
20 × 24 ft 5.93 267→294 Ready-mix
24 × 24 ft 7.11 320→352 Ready-mix
20 × 30 ft 7.41 334→367 Ready-mix
30 × 30 ft 11.11 500→550 Ready-mix
30 × 40 ft 14.81 667→734 Ready-mix

All 111 sizes are worked out on the size list. all the slab sizes.

Not pouring a slab?

The other 7 calculators

every concrete calculator sorts them by what you already know.

Before you call the plant

Questions

How many 80 lb bags are in a cubic yard?

45, and you buy 45. An 80 lb bag of mix yields about 0.60 cubic feet once water is in it, and a cubic yard is 27 cubic feet. A 60 lb bag yields about 0.45 cubic feet, so 60 of those make a yard. Every bag count on this site is rounded up, because a store will not sell you nine tenths of a bag.

Where exactly do I measure thickness from?

From the top of the compacted gravel base to the finished surface of the slab. The gravel is not concrete, and the mistake is expensive: one inch of it counted as concrete on a 20 × 20 ft slab is 1.23 cubic yards. Compact the base, set a stake to the finished height, and measure down from that.

Bags or ready-mix — where is the line?

Around 60 bags of 80 lb, which is 36 cubic feet or 1.33 cubic yards. Under that you can mix it in a day with a rented mixer and one helper, and you pay only for what you open. Over it you are buying several pallets, handling two tons or more by hand, and racing the set on the first batch you placed. Some plants charge a short-load fee below about 3 yards, so ask when you book.

How much extra should I order?

10 percent, and where it appears depends on what you are buying. Ready-mix carries it inside the ordered figure, because a truck will not come back for a quarter yard. Bag counts do not: the headline count is the volume, and the plus figure sits beside it, because bags are bought one at a time and an unopened one goes back. Either way the allowance covers spillage, a base that is not perfectly flat and the thickness you gain at the edges of the form.

What is a mixer-truck load?

A full truckload is typically about 10 cubic yards, and that is the figure this site plans with. Ask when you book: drums vary, and a plant will tell you what it is sending. The load count here is worked from the ordered volume — the one that already includes the 10% allowance — because that is what actually has to fit on the truck.

What is the weight figure for?

Hauling. Concrete runs about 140 lb per cubic foot, so a cubic yard weighs roughly 3,780 lb. Anything above half a yard is past what a half-ton pickup should carry, which is another reason the bag route stops making sense long before the arithmetic does.

Does this include rebar, forms or labour?

No. The price band is concrete delivered: your own price per yard on the ordered volume, taken 15% either side of the middle to cover what a quote actually varies by. Forms, gravel, mesh or bar, a pump if the truck cannot reach, and finishing are all separate. Get the plant to quote your postcode before you budget.

Bag yields: QUIKRETE Concrete Mix data sheet No. 1101. Price basis: Concrete Financial Insights weighted average selling price for 2025, escalated with U.S. Bureau of Labor Statistics PPI series PCU327320327320 (2026-07). Prices vary by region — enter your own quote above.